Preventive maintenance of Siemens Masterdrives
Number of project hours: 215 hours
Project duration: 2 months
Client expectation
Our client contacted us within the context of the preventive maintenance of 3 SIEMENS Masterdrives. These controlled and ensured the volume and water pressure necessary for our client’s production. However, these drives had not been maintained for several years and the manufacturer had stopped offering after-sales service for them. In addition, the client did not have any spare drives in stock.
DV GROUP Solution
A DV GROUP expert visited our client to carry out the preventive maintenance of two of the three drives. The condensators on the intermediary circuit were replaced, dust removed and the drives were tested. Two weeks later, we recommissioned these two drives and dismantled the third drive. In January, we finished the preventive maintenance with the commissioning of the last drive.
Work carried out
- Disassembly and re-assembly of three 150 kW Siemens Masterdrives at the client’s site.
- Shipping of the drives to Metz; preventive maintenance with the replacement of the intermediate circuit condensators.
- Monitoring and assistance at the start-up of the installation
Clients gains and benefits
- A customised solution appropriate to the client’s needs.
- A permanent solution thanks to the preventive work carried out on the drives.
- Greater serenity in relation to unexpected breakdowns, thanks to regular maintenance.
Expertise
We provide you with engineering, maintenance and control solutions based on our knowledge of your processes.
Case studies
You may also be interested in
Vibration monitoring of a coffee production line
Obsolescence Management: Audit of a Truck Engine Factory’s Equipment Fleet
Repair and reliability of drives
ELOPAK: Corrective preventive electronic maintenance
43 Simovert Masterdrive drives from 0.75 kW to 700 kW
To safeguard the reliability of 32 Siemens (6SE70) Masterdrives on a paper machine section
MELEGHY: Preventive maintenance of 24 Siemens Powerblocks drives
Preventive maintenance contract
Emergency repair on a 120KW ABB ACS800 drive
2 LEROY SOMER 600 kW variators
Overhaul of 12 Siemens Torque Simotics T-1FW3 motors
Preventive maintenance for 17 Siemens servomotors and drives
X-FAB : Replacement of two extractor fans
Troubleshooting of an induced draught fan
19 50 kg (2.2 kW) to 5 ton (7.2MW) motor/reducer/ventilator assemblies
Overhaul of an extruder reducer with 2 indexed output shafts
Maintenance électronique et électromécanique de 3 installations Banbury (moteurs CC et variateurs)
Moteur Siemens 450 KW avec mode de refroidissement à eau
Révision d’un moteur CC 540 KW de laminoir
LENGLET IMPRIMEURS : 1€ to reduce your energy bill
Modelling of the HTA/BT electric network
Fiabilisation d’une ligne de décapage
EMC analysis
Modélisation réseau
Reducer polymerizer vibration monitoring
Maintenance method improvement project
Contrat de mesures vibratoires
Contrat de suivi vibratoire
Contrôle par onde de choc de 46 moteurs asynchrones de 7,5KW (400V) à 750KW (5000V)
Remplacement de 4 CN obsolètes 810T par 1 CN Sinumerik 840D sl Siemens
Modification îlot ZF
Remplacement robot presse
Cellule robotisée de dépose résine et convoyage d’une ligne d’emballage de batteries DAIMLER
Robot de palettisation ligne peinture
Robot de lavage de bacs à endives
Digital Twin d’une nouvelle ligne de production
LENGLET IMPRIMEURS : Retrofit variateurs moteurs unités de récupération de solvant
Rétrofit de l’électronique de puissance et de commande d’une ligne de découpe
Rétrofit électrique pont HFX 16T
Motorisation of compressors in a colliery gas compression station
Obsolescence of the oven’s 7 CC ALSTHOM drives
Retrofitting of an impressive balancing bench
Retrofit of a machine for superfinishing machined parts
Retrofitting of the robotics part of a nine-colour printing line