Case studies 29 August 2023

Obsolescence of the oven’s 7 CC ALSTHOM drives

Implementation of 8 drives from 350A to 825A, 4-quadrant technology

Replacement of the ultra rapid contactors to break the loops

Preparation for network connection with the oven’s monitoring system

Analogue steering following this, at the client’s request

Implementation of 8 drives from 350A to 825A, 4-quadrant technology

Clients gains and benefits

 

Our client has been able to take advantage of the full refurbishment of his installation. We have installed new, premium brand equipment which will be easily maintainable and repairable in the long term. This has therefore allowed stoppage times owing to breakages and troubleshooting to be reduced and now matches the client’s programmed stoppages.