Troubleshooting of an induced draught fan
Number of hours dedicated to the project: 65 hours
Client expectation
Our client is a waste reclamation and processing centre. They contacted us following an outbreak of fire on a bearing of the 450 kW electric cooling fan, causing a site shutdown.
DV GROUP Solution
Emergency intervention by the Electro-mechanical teams that same night.
When our experts arrived onsite, it appeared that the bearing had welded itself to the shaft. The decision was therefore made to displace the bearing housing in order to be able to carry out an emergency repair. Three teams from Cambrai and Grigny were required day and night in order to complete the work.
The client restarted production the next evening.
In order to secure production, we put in place continuous machine feedback.
Work carried out
- Machine monitoring using a Phantom captor for feedback following the work
- Replacement of bearing housings, onsite modification of the chassis in order to displace the housing fixing
Clients gains and benefits
- Restarting of production within a few hours: reduction of stoppage time
- Machine feedback in order to anticipate any faults
Expertise
We provide you with engineering, maintenance and control solutions based on our knowledge of your processes.
Case studies
You may also be interested in
Vibration monitoring of a coffee production line
Obsolescence Management: Audit of a Truck Engine Factory’s Equipment Fleet
Repair and reliability of drives
ELOPAK: Corrective preventive electronic maintenance
Preventive maintenance of Siemens Masterdrives
43 Simovert Masterdrive drives from 0.75 kW to 700 kW
To safeguard the reliability of 32 Siemens (6SE70) Masterdrives on a paper machine section
MELEGHY: Preventive maintenance of 24 Siemens Powerblocks drives
Preventive maintenance contract
Emergency repair on a 120KW ABB ACS800 drive
2 LEROY SOMER 600 kW variators
Overhaul of 12 Siemens Torque Simotics T-1FW3 motors
Preventive maintenance for 17 Siemens servomotors and drives
X-FAB : Replacement of two extractor fans
19 50 kg (2.2 kW) to 5 ton (7.2MW) motor/reducer/ventilator assemblies
Overhaul of an extruder reducer with 2 indexed output shafts
Maintenance électronique et électromécanique de 3 installations Banbury (moteurs CC et variateurs)
Moteur Siemens 450 KW avec mode de refroidissement à eau
Révision d’un moteur CC 540 KW de laminoir
LENGLET IMPRIMEURS : 1€ to reduce your energy bill
Modelling of the HTA/BT electric network
Fiabilisation d’une ligne de décapage
EMC analysis
Modélisation réseau
Reducer polymerizer vibration monitoring
Maintenance method improvement project
Contrat de mesures vibratoires
Contrat de suivi vibratoire
Contrôle par onde de choc de 46 moteurs asynchrones de 7,5KW (400V) à 750KW (5000V)
Remplacement de 4 CN obsolètes 810T par 1 CN Sinumerik 840D sl Siemens
Modification îlot ZF
Remplacement robot presse
Cellule robotisée de dépose résine et convoyage d’une ligne d’emballage de batteries DAIMLER
Robot de palettisation ligne peinture
Robot de lavage de bacs à endives
Digital Twin d’une nouvelle ligne de production
LENGLET IMPRIMEURS : Retrofit variateurs moteurs unités de récupération de solvant
Rétrofit de l’électronique de puissance et de commande d’une ligne de découpe
Rétrofit électrique pont HFX 16T
Motorisation of compressors in a colliery gas compression station
Obsolescence of the oven’s 7 CC ALSTHOM drives
Retrofitting of an impressive balancing bench
Retrofit of a machine for superfinishing machined parts
Retrofitting of the robotics part of a nine-colour printing line