19 50 kg (2.2 kW) to 5 ton (7.2MW) motor/reducer/ventilator assemblies
Number of project hours: 290 hours
4 technicians
Client expectation
Each year, out client, a ready-to-use cement, aggregates and concrete manufacturer, undertakes technical stoppages in order to maintain its ovens. Indeed, the cement manufacturer takes advantage of these 3-week stoppages to replace a large number of machines and thus overhaul the dismantled equipment. In order to be totally trouble-free with their running and restarting, he wished to work with a reliable partner who would:
- take responsibility for the overall operation
- know how to manage the electrical and mechanical parts of the drive system
- provide a technical guarantee for operations allowing secure restarting
- comply with the safety regulations
DV GROUP Solution
Satisfied with our expertise and our offer, our client chose to grant us the exclusivity of the replacement / overhauling of machines during its technical stoppages. This time, for our fourth collaboration, the experts from our electro-mechanical agency in Saint-Priest were mobilised for 3 weeks to process 19 machines (moto-reducers, moto-ventilators and motors) from 50 kg (2.2 kW) to 5 tons (7.2MW) and to keep to the deadline set by our client.
Work carried out
DV GROUP technical solution:
Disassembly/reassembly of 19 motor/reducer/ventilator assemblies
- Site management
- Implementation of safety regulations
- Implementation of appropriate lifting means and transport
- Electric cable dismantling / mechanical disassembly and reassembly
- Swapping of couplings and hydraulic couplings
- Laser alignment of direct drives and pully/belt systems
- Machine trials
- Site cleaning
Overhauling of 5 moto-ventilators and moto-reducers in the workshop
- Monitoring of the electrical part (insulation, resistances, shock wave, index)
- Monitoring of the mechanical part (bearing seats, joints, interlocking)
- External and internal depollution via cleaning and steaming
- Dynamic balancing of the turbines
- Monitoring of reducers: lubrification, waterproofing, gearing
- Changing of the bearings and SKF range joints
- Anti-flash finish
- Empty and loaded testing on the trial platform
Gains et bénéfices client
- Global offer from DV GROUP: total management, from site preparation to a technical validation report and feedback on the experience at the end of the stoppage
- Control of procedures and of the environment
- Compliance with the budget and deadlines
- Technical security
- Establishment of a climate of trust: frequent, on-going exchanges and support from a dedicated DV GROUP contact
Expertise
We provide you with engineering, maintenance and control solutions based on our knowledge of your processes.
Case studies
You may also be interested in

Modélisation réseau

Reducer polymerizer vibration monitoring

Maintenance method improvement project

Contrat de mesures vibratoires

Contrat de suivi vibratoire

Contrôle par onde de choc de 46 moteurs asynchrones de 7,5KW (400V) à 750KW (5000V)

Remplacement de 4 CN obsolètes 810T par 1 CN Sinumerik 840D sl Siemens

Modification îlot ZF

Remplacement robot presse

Cellule robotisée de dépose résine et convoyage d’une ligne d’emballage de batteries DAIMLER

Robot de palettisation ligne peinture

Robot de lavage de bacs à endives

Digital Twin d’une nouvelle ligne de production

LENGLET IMPRIMEURS : Retrofit variateurs moteurs unités de récupération de solvant

Rétrofit de l’électronique de puissance et de commande d’une ligne de découpe

Rétrofit électrique pont HFX 16T

Motorisation of compressors in a colliery gas compression station

Obsolescence of the oven’s 7 CC ALSTHOM drives

Retrofitting of an impressive balancing bench

Retrofit of a machine for superfinishing machined parts

Retrofitting of the robotics part of a nine-colour printing line

Modification of the ride “Tonnerre 2 Zeus” [Zeus’ Thunder]

Reduce and understand your energy consumption with SMART ENERGY

Vibration monitoring of a coffee production line

Obsolescence Management: Audit of a Truck Engine Factory’s Equipment Fleet

Repair and reliability of drives

ELOPAK: Corrective preventive electronic maintenance

Preventive maintenance of Siemens Masterdrives

43 Simovert Masterdrive drives from 0.75 kW to 700 kW

To safeguard the reliability of 32 Siemens (6SE70) Masterdrives on a paper machine section

MELEGHY: Preventive maintenance of 24 Siemens Powerblocks drives

Preventive maintenance contract

Emergency repair on a 120KW ABB ACS800 drive

2 LEROY SOMER 600 kW variators

Overhaul of 12 Siemens Torque Simotics T-1FW3 motors

Preventive maintenance for 17 Siemens servomotors and drives

X-FAB : Replacement of two extractor fans

Troubleshooting of an induced draught fan

Overhaul of an extruder reducer with 2 indexed output shafts

Maintenance électronique et électromécanique de 3 installations Banbury (moteurs CC et variateurs)

Moteur Siemens 450 KW avec mode de refroidissement à eau

Révision d’un moteur CC 540 KW de laminoir

LENGLET IMPRIMEURS : 1€ to reduce your energy bill

Modelling of the HTA/BT electric network

Fiabilisation d’une ligne de décapage

EMC analysis

Modélisation réseau

Reducer polymerizer vibration monitoring

Maintenance method improvement project

Contrat de mesures vibratoires

Contrat de suivi vibratoire

Contrôle par onde de choc de 46 moteurs asynchrones de 7,5KW (400V) à 750KW (5000V)

Remplacement de 4 CN obsolètes 810T par 1 CN Sinumerik 840D sl Siemens

Modification îlot ZF

Remplacement robot presse

Cellule robotisée de dépose résine et convoyage d’une ligne d’emballage de batteries DAIMLER

Robot de palettisation ligne peinture

Robot de lavage de bacs à endives

Digital Twin d’une nouvelle ligne de production

LENGLET IMPRIMEURS : Retrofit variateurs moteurs unités de récupération de solvant

Rétrofit de l’électronique de puissance et de commande d’une ligne de découpe

Rétrofit électrique pont HFX 16T

Motorisation of compressors in a colliery gas compression station

Obsolescence of the oven’s 7 CC ALSTHOM drives

Retrofitting of an impressive balancing bench

Retrofit of a machine for superfinishing machined parts

Retrofitting of the robotics part of a nine-colour printing line

Modification of the ride “Tonnerre 2 Zeus” [Zeus’ Thunder]

Reduce and understand your energy consumption with SMART ENERGY

Vibration monitoring of a coffee production line

Obsolescence Management: Audit of a Truck Engine Factory’s Equipment Fleet

Repair and reliability of drives

ELOPAK: Corrective preventive electronic maintenance

Preventive maintenance of Siemens Masterdrives

43 Simovert Masterdrive drives from 0.75 kW to 700 kW

To safeguard the reliability of 32 Siemens (6SE70) Masterdrives on a paper machine section

MELEGHY: Preventive maintenance of 24 Siemens Powerblocks drives

Preventive maintenance contract

Emergency repair on a 120KW ABB ACS800 drive

2 LEROY SOMER 600 kW variators

Overhaul of 12 Siemens Torque Simotics T-1FW3 motors

Preventive maintenance for 17 Siemens servomotors and drives

X-FAB : Replacement of two extractor fans

Troubleshooting of an induced draught fan

Overhaul of an extruder reducer with 2 indexed output shafts

Maintenance électronique et électromécanique de 3 installations Banbury (moteurs CC et variateurs)

Moteur Siemens 450 KW avec mode de refroidissement à eau

Révision d’un moteur CC 540 KW de laminoir

LENGLET IMPRIMEURS : 1€ to reduce your energy bill

Modelling of the HTA/BT electric network