Casi studio 05 September 2023

2 LEROY SOMER 600 kW variators

Client expectation

Our client, one of the world leaders in the transformation of agricultural production into foodstuff ingredients, called on our experts to intervene on two 600 kW Leroy Somer variators which had broken down. Indeed, part of its factory was at a standstill and they wished us to urgently repair them onsite as:

  • It would take several weeks to supply new variators
  • The handling of new variators is delicate, given that the variators are on the 1st floor at the back of an electrical room.

DV GROUP solution

He asked us to urgently intervene onsite in order to limit as far as possible stoppages, as well as losses. The urgent expertise revealed the presence of acid, which had significantly damaged the condensators of both products, as well as the entry-bridge and card of the first variator. To remedy this, our experts:

  • Dismantled the arm modules and entry-bridge of variator No. 2
  • Cleaned up both variators
  • Put the protistors in place
  • Reassembled both variators
  • Proceeded with trials: variator No. 2 was restarted. On the other hand, the CPU card and supply to variator No. 1 were found to be out-of-order, leading our experts to replace them.

Following this intervention and several breakdowns encountered on the variators the previous months, we advised our client to undertake an audit of their installations, as well as an action plan. Satisfied with our recommendations and our offer, our client chose to entrust us with the carrying out of preventive measures on nine of its 250 to 900 kW variators. Our experts are currently processing the turbines, as well as the power bridges.