Client expectation
Our client is a waste reclamation and processing centre. They contacted us following an outbreak of fire on a bearing of the 450 kW electric cooling fan, causing a site shutdown.
DV GROUP Solution
Emergency intervention by the Electro-mechanical teams that same night.
When our experts arrived onsite, it appeared that the bearing had welded itself to the shaft. The decision was therefore made to displace the bearing housing in order to be able to carry out an emergency repair. Three teams from Cambrai and Grigny were required day and night in order to complete the work.
The client restarted production the next evening.
In order to secure production, we put in place continuous machine feedback.
Work carried out
- Machine monitoring using a Phantom captor for feedback following the work
- Replacement of bearing housings, onsite modification of the chassis in order to displace the housing fixing
Expertisen
Wir bieten Ihnen Lösungen in den Bereichen Engineering, Maintenance und Control, die mit der Kenntnis Ihrer Prozesse verbunden sind.
Fallstudien
Das könnte Sie interessieren
Notfallreparatur eines Extrudermotors (200 kW) nach einer Schwingungsmessung
Fallstudie
28 November 2024
Plan zur vorbeugenden Wartung von Large Drive-Antrieben
Fallstudie
29 August 2024
Schwingungsüberwachung einer Kaffeeproduktionsanlage
Fallstudie
05 April 2024
Obsoleszenzmanagement: Prüfung des Materialbestands einer Fabrik für LKW-Motoren
Fallstudie
14 November 2023
Reparatur und Zuverlässigkeit von Antrieben
Fallstudie
12 September 2023
ELOPAK: Korrigierende vorbeugende elektronische Wartung
Fallstudie
12 September 2023
Präventive Maintenance von Siemens Masterdrive
Fallstudie
11 September 2023
Sicherstellung der Zuverlässigkeit von 32 Siemens (6SE70) Masterdrives in einer Papierfabrik
Fallstudie
11 September 2023
MELEGHY: Präventivwartung von 24 Siemens Powerblocks-Antrieben
Fallstudie
11 September 2023
Preventive maintenance contract
Fallstudie
05 September 2023
Emergency repair on a 120KW ABB ACS800 drive
Fallstudie
05 September 2023
2 LEROY SOMER 600 kW variators
Fallstudie
05 September 2023
Overhaul of 12 Siemens Torque Simotics T-1FW3 motors
Fallstudie
05 September 2023
Preventive maintenance for 17 Siemens servomotors and drives
Fallstudie
04 September 2023
X-FAB : Replacement of two extractor fans
Fallstudie
04 September 2023
19 50 kg (2.2 kW) to 5 ton (7.2MW) motor/reducer/ventilator assemblies
Fallstudie
01 September 2023
Overhaul of an extruder reducer with 2 indexed output shafts
Fallstudie
01 September 2023
Modelling of the HTA/BT electric network
Fallstudie
01 September 2023
Projekt zur Verbesserung der Wartungsmethoden
Fallstudie
29 August 2023
Motorisation of compressors in a colliery gas compression station
Fallstudie
29 August 2023
Obsolescence of the oven’s 7 CC ALSTHOM drives
Fallstudie
29 August 2023
Retrofitting of an impressive balancing bench
Fallstudie
29 August 2023
Retrofit of a machine for superfinishing machined parts
Fallstudie
29 August 2023
Retrofitting of the robotics part of a nine-colour printing line
Fallstudie
29 August 2023
Modification of the ride “Tonnerre 2 Zeus” [Zeus’ Thunder]
Fallstudie
23 August 2023