{"id":10938,"date":"2023-08-23T16:05:16","date_gmt":"2023-08-23T14:05:16","guid":{"rendered":"https:\/\/dv-group.com\/etudes-de-cas\/asterix\/"},"modified":"2023-09-18T16:54:14","modified_gmt":"2023-09-18T14:54:14","slug":"asterix","status":"publish","type":"etudes-de-cas","link":"https:\/\/dv-group.com\/it\/etudes-de-cas\/asterix\/","title":{"rendered":"Modification of\u00a0 the ride &#8220;Tonnerre 2 Zeus&#8221; [Zeus\u2019 Thunder]"},"content":{"rendered":"<section  class=\"bloc-content -content  \">\n    <div class=\"container\">\n                                            <div class=\"txt-img--content\">\n                    <h3><strong>Client expectation\u00a0<\/strong><\/h3>\n<p>Within the context of the attraction\u2019s renovation, the Ast\u00e9rix amusement park wanted to invest in a new track, as well as a new train for its most popular ride, Zeus\u2019 Thunder.<\/p>\n<p>The park was therefore looking for an integrator capable of linking the new elements to the existing automatism, while responding to new improvement requirements:<\/p>\n<p>&#8211; modernisation of the maintenance track<\/p>\n<p>&#8211; improvement in the lift\u2019s grip speed<\/p>\n<p>&#8211; modernisation of the braking system<\/p>\n<p>&#8211; modernisation of the control voltage<\/p>\n<p>&nbsp;<\/p>\n                <\/div>\n                                <\/div>\n<\/section>\n\n<section  class=\"bloc-content -content  \">\n    <div class=\"container\">\n                                            <div class=\"txt-img--content\">\n                    <h3><strong>DV GROUP solutions\u00a0<\/strong><\/h3>\n<p>In order to understand the project correctly and reach the objectives, we proposed a two-phase management:<\/p>\n<p><em>Phase 1: Pre-design<\/em><\/p>\n<p>We carried out onsite surveys of the electrical cabinet installation and the various captors and actuators which would be modified or integrated into the track and on the doubling of the maintenance track. We then modelled the robot program in the design office.\u00a0Lastly, we organised an onsite visit in partnership with T\u00dcV. These steps allowed us to draft the operational specifications file related to the train modifications (track and doubling of the maintenance track), which we presented to our client.<\/p>\n<p><em>\u00a0<\/em><\/p>\n<p><em>Phase 2: Implementation of the project following validation <\/em><\/p>\n<ul>\n<li>Replacement of the robot\u2019s CPU, with an increase in memory size in order to increase reactivity.<\/li>\n<li>Addition of an on\/off switch at technical room level in the station and the maintenance track<\/li>\n<li>Integration of Flip Flop management for the second maintenance track in the technical room<\/li>\n<li>Replacement of the tyre casings allowing the train to brake before arriving in the station<\/li>\n<li>Cabling of the various actuators and captors allowing the ride to be driven correctly<\/li>\n<li>Exchanges with the SYSTEMA security, monitoring and validation bodies<\/li>\n<li>Replacement of the lift cupboards and station management cabinets<\/li>\n<li>Modification of the cycle times allowing a faster train grip speed<\/li>\n<li>Connection of the lift drive<\/li>\n<li>Addition of an operator detection mat in order to validate presence during the ride operating phases<\/li>\n<\/ul>\n                <\/div>\n                                <\/div>\n<\/section>\n\n\n\n<section  class=\"zoom-technique\">\n            <h4>Equipment implemented<\/h4>\n                <div class=\"zoom-technique--container container\">\n                                            <div class=\"card picto full-bg\">\n                                            <div class=\"img\">\n                            <img decoding=\"async\" src=\"https:\/\/dv-group.com\/app\/uploads\/2023\/08\/automatiser.png\" alt=\"\">\n                        <\/div>\n                                                                <h4>Automation :<\/h4>\n<p>Rockwell Control Logic and separate on\/off point solution<\/p>\n<p>RFID chip for all trains<\/p>\n                                    <\/div>\n                                            <div class=\"card picto full-bg\">\n                                            <div class=\"img\">\n                            <img decoding=\"async\" src=\"https:\/\/dv-group.com\/app\/uploads\/2023\/08\/electrique.png\" alt=\"\">\n                        <\/div>\n                                                                <h4>Electrics :<\/h4>\n<p>Upgrading to European control voltage standards: 110V (American standard) to 24V<\/p>\n<p>Realisation of 5 cupboards comprising all the communication and control exchanges and the motor feedback<\/p>\n<ul>\n<li>1 cupboard for the lift<\/li>\n<li>1 cupboard for the maintenance room<\/li>\n<li>1 cupboard under the station<\/li>\n<li>1 pneumatic distribution cupboard<\/li>\n<li>1 variable speed cupboard<\/li>\n<\/ul>\n                                    <\/div>\n                                            <div class=\"card picto full-bg\">\n                                            <div class=\"img\">\n                            <img decoding=\"async\" src=\"https:\/\/dv-group.com\/app\/uploads\/2023\/08\/fabrication.png\" alt=\"\">\n                        <\/div>\n                                                                <h4>Drive :<\/h4>\n<p>Integration of Schneider brand drive<\/p>\n                                    <\/div>\n                                            <div class=\"card picto full-bg\">\n                                            <div class=\"img\">\n                            <img decoding=\"async\" src=\"https:\/\/dv-group.com\/app\/uploads\/2023\/08\/roue.png\" alt=\"\">\n                        <\/div>\n                                                                <h4><strong>Pneumatics : <\/strong><\/h4>\n<p>Integration of a Festo pneumatic distributor for the management of the brakes on entry into the station and parking<\/p>\n                                    <\/div>\n                    <\/div>\n    <\/section>\n\n<section  class=\"bloc-content -content  \">\n    <div class=\"container\">\n                                            <div class=\"txt-img--content\">\n                    <h4>Work carried out<\/h4>\n<p>DV GROUP technical solution:<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>IN THE WORKSHOP :<\/p>\n<p>Realisation of electrical designs<\/p>\n<p>Realisation of API designs<\/p>\n<p>Realisation of drive designs<\/p>\n<p>Supply and manufacture of cupboards in the workshop<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>ONSITE :<\/p>\n<p>Integration of the various cupboards<\/p>\n<p>Fitting of cable paths and power and control cables<\/p>\n<p>Connection of the various bodies (gates, brake, harness etc.)<\/p>\n<p>Implementation<\/p>\n                <\/div>\n                                <\/div>\n<\/section>\n\n<section  class=\"testimony\">\n    <div class=\"container\">\n                    <p>&#8220;Your experts have made every effort to open the attraction on time. Whether humanly or professionally I am very satisfied with our collaboration&#8221;<\/p>\n                            <p class=\"name\">Maintenance Manager at Parc Asterix<\/p>\n                            <p class=\"role\">Responsable maintenance au Parc Ast\u00e9rix<\/p>\n                            <a href=\"https:\/\/dv-group.com\/en\/interview-de-monsieur-jourdain-responsable-de-la-maintenance-et-renovation-du-parc-asterix\/\" target=\"_self\" class=\"btn primary\">Read the interview<\/a>\n            <\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":1848,"template":"","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"Modification of  the ride &quot;Tonnerre 2 Zeus&quot; [Zeus\u2019 Thunder]","_seopress_titles_desc":"The park was therefore looking for an integrator capable of linking the new elements to the existing automatism, while responding to new improvement requirements:","_seopress_robots_index":""},"pays":[313],"category-cs":[430,268],"secteurs-activites":[431,290],"solutions":[332],"class_list":["post-10938","etudes-de-cas","type-etudes-de-cas","status-publish","has-post-thumbnail","hentry","pays-francia-it","category-cs-engineering-it","category-cs-ingegneria","secteurs-activites-amusement-park-en-it","secteurs-activites-parco-divertimenti","solutions-automazione"],"acf":[],"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/etudes-de-cas\/10938","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/etudes-de-cas"}],"about":[{"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/types\/etudes-de-cas"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/media\/1848"}],"wp:attachment":[{"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/media?parent=10938"}],"wp:term":[{"taxonomy":"pays","embeddable":true,"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/pays?post=10938"},{"taxonomy":"category-cs","embeddable":true,"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/category-cs?post=10938"},{"taxonomy":"secteurs-activites","embeddable":true,"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/secteurs-activites?post=10938"},{"taxonomy":"solutions","embeddable":true,"href":"https:\/\/dv-group.com\/it\/wp-json\/wp\/v2\/solutions?post=10938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}