{"id":6891,"date":"2023-09-01T16:58:11","date_gmt":"2023-09-01T14:58:11","guid":{"rendered":"http:\/\/www.dv-group.com\/etudes-de-cas\/19-ensembles-moteurs-reducteurs-ventilateurs-de-50-kg-22-kw-a-5-tonnes-72mw\/"},"modified":"2023-09-15T09:52:34","modified_gmt":"2023-09-15T07:52:34","slug":"19-ensembles-moteurs-reducteurs-ventilateurs-de-50-kg-22-kw-a-5-tonnes-72mw","status":"publish","type":"etudes-de-cas","link":"https:\/\/dv-group.com\/en\/etudes-de-cas\/19-ensembles-moteurs-reducteurs-ventilateurs-de-50-kg-22-kw-a-5-tonnes-72mw\/","title":{"rendered":"19 50 kg (2.2 kW) to 5 ton (7.2MW) motor\/reducer\/ventilator assemblies"},"content":{"rendered":"<section  class=\"bloc-content -content  \">\n    <div class=\"container\">\n                                            <div class=\"txt-img--content\">\n                    <h4 class=\"p1\">Client expectation<\/h4>\n<p>Each year, out client, a ready-to-use cement, aggregates and concrete manufacturer, undertakes technical stoppages in order to maintain its ovens. Indeed, the cement manufacturer takes advantage of these 3-week stoppages to replace a large number of machines and thus overhaul the dismantled equipment. In order to be totally trouble-free with their running and restarting, he wished to work with a reliable partner who would:<\/p>\n<ul>\n<li>take responsibility for the overall operation<\/li>\n<li>know how to manage the electrical and mechanical parts of the drive system<\/li>\n<li>provide a technical guarantee for operations allowing secure restarting<\/li>\n<li>comply with the safety regulations<\/li>\n<\/ul>\n                <\/div>\n                                <\/div>\n<\/section>\n\n<section  class=\"bloc-content -content  \">\n    <div class=\"container\">\n                                            <div class=\"txt-img--content\">\n                    <h4>DV GROUP Solution<\/h4>\n<p>Satisfied with our expertise and our offer, our client chose to grant us the exclusivity of the replacement \/ overhauling of machines during its technical stoppages. This time, for our fourth collaboration, the experts from our electro-mechanical agency in Saint-Priest were mobilised for 3 weeks to process 19 machines (moto-reducers, moto-ventilators and motors) from 50 kg (2.2 kW) to 5 tons (7.2MW) and to keep to the deadline set by our client.<\/p>\n                <\/div>\n                                <\/div>\n<\/section>\n\n<section  class=\"bloc-content -content  \">\n    <div class=\"container\">\n                                            <div class=\"txt-img--content\">\n                    <h4 class=\"p1\">Work carried out<\/h4>\n<p class=\"uptitle\">DV GROUP technical solution:<\/p>\n<div class=\"two-col\">\n<p>Disassembly\/reassembly of 19 motor\/reducer\/ventilator assemblies<\/p>\n<ul>\n<li>Site management<\/li>\n<li>Implementation of safety regulations<\/li>\n<li>Implementation of appropriate lifting means and transport<\/li>\n<li>Electric cable dismantling \/ mechanical disassembly and reassembly<\/li>\n<li>Swapping of couplings and hydraulic couplings<\/li>\n<li>Laser alignment of direct drives and pully\/belt systems<\/li>\n<li>Machine trials<\/li>\n<li>Site cleaning<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Overhauling of 5 moto-ventilators and moto-reducers in the workshop<\/p>\n<ul>\n<li>Monitoring of the electrical part (insulation, resistances, shock wave, index)<\/li>\n<li>Monitoring of the mechanical part (bearing seats, joints, interlocking)<\/li>\n<li>External and internal depollution via cleaning and steaming<\/li>\n<li>Dynamic balancing of the turbines<\/li>\n<li>Monitoring of reducers: lubrification, waterproofing, gearing<\/li>\n<li>Changing of the bearings and SKF range joints<\/li>\n<li>Anti-flash finish<\/li>\n<li>Empty and loaded testing on the trial platform<\/li>\n<\/ul>\n<\/div>\n                <\/div>\n                                <\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"","protected":false},"featured_media":2491,"template":"","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"19 50 kg (2.2 kW) to 5 ton (7.2MW) motor\/reducer\/ventilator assemblies","_seopress_titles_desc":"Our customer takes technical shutdowns to maintain its furnaces, and wants to take advantage of them to replace a large number of machines and overhaul equipment.","_seopress_robots_index":""},"pays":[136],"category-cs":[63],"secteurs-activites":[132],"solutions":[130],"class_list":["post-6891","etudes-de-cas","type-etudes-de-cas","status-publish","has-post-thumbnail","hentry","pays-france-en-2","category-cs-maintenance-en","secteurs-activites-construction-building-materials-en","solutions-electromecanique-en"],"acf":[],"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/etudes-de-cas\/6891","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/etudes-de-cas"}],"about":[{"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/types\/etudes-de-cas"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/media\/2491"}],"wp:attachment":[{"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/media?parent=6891"}],"wp:term":[{"taxonomy":"pays","embeddable":true,"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/pays?post=6891"},{"taxonomy":"category-cs","embeddable":true,"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/category-cs?post=6891"},{"taxonomy":"secteurs-activites","embeddable":true,"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/secteurs-activites?post=6891"},{"taxonomy":"solutions","embeddable":true,"href":"https:\/\/dv-group.com\/en\/wp-json\/wp\/v2\/solutions?post=6891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}